Neumann Construction has undertaken a 6-month-long fabrication as part of the Neumann Contractors joint project
Test Rig Safety Guard
Neumann Construction has produced a safety guard for the counterweight section of the test rig used by Neumann Equipment.
12 Tonne Cable Drum Stands
Neumann Construction is producing 12 Tonne Cable Drum Stands as part of the Neumann Equipment Cable Drum Stand range inventory.
Quick Hitch Capstan Winches
Neumann Construction adds Quick Hitch Capstan Winch housing to its stock inventory, expanding the Neumann Equipment range.
Hydraulic Tank For A Dredge
Neumann Construction delivers a steel hydraulic oil tank for Neumann Dredge Fleet, ensuring optimal performance and reliability.
Complex Steel Fabrications
Neumann Construction: Experts in complex steel fabrications for diverse industries. Your trusted partner for precision engineering.
Infrastructure Steel Structures
Crafting durable steel structures to meet your infrastructure requirements. Quality construction for lasting results.
Welding with Precision!
Neumann Construction: Following Australian Standard for the Best Welding Practices, ensuring superior quality and safety.
Bridge Pile Cap Fabrication
Neumann Construction secures steel fabrication project for Currumbin Creek Bridges’ pile caps widening. Building bridges with precision.
Byron Bay Bus Interchange
Neumann Contractors have just finished installation of the last canopy structure for the Byron Bay Bus Interchange.
- Page 1 of 2
- 1
- 2



























































